Geometric Pendant Lighting Continued

May 7, 2014

With only 15 days left to complete all work for the degree show, the time is spent cold working the tops of the lights, as well as purchasing the light fittings which has been an extremely long and difficult process due to the design of the lights. Tomorrow is the last glassblowing session to attend which will result in the last two pieces being blown in clear, and Heliotrope. These can then be brought over from Matlock on Monday 12th May and cold worked, and finally fitted with the correct light fittings which should be delivered by this day too.

 

The university have arranged for PAT testing to commence on 13th May, although if the light fitting delivery does not arrive then or I have ordered the wrong fittings, I will need to arrange the PAT tests independently and pay for this myself. 